Thursday, December 21, 2006
thanks to the police for the suport
almost finish
new electric system clasroom
old electric wire
new electricity System
all the classroms and Library at the school.
was replace whit new eletric wire protect by hose.
alot of electric cable and hose.
but the school now is nice and safe.
before cable was hanging out and very damage.
whit chances to in jure a Child o worts get the school in fire, Thanks to Hnads to Honduras and Ted Goulette and Jack and Jake for this.
new roofing
Old Roofing "Asbestos" and old wood frame
the beginnig of the L shape
the library is the beggining of the L shape .
below you will see the rest the school.
is big , after the classrooms line in L shape we have 2 more buildings that make look like a big U one the building is a clasroom and the other storage and principal offices.
here we have in this picture Leslie and Linda and some locals painting.
other section school
about half school view here
Wood Frame Materials
School Painting inside and out
Pila
Here is the Low Tech design, i have the chances to talk to the Garifuna commited, and we decide to go low tech , since we are so closer to the ocean , Water tower whit Pump.
will required somebody give continuos check and haves to have some knoledges, and also the metal will rust very easy in a year o two.
we decide go whit at Pila a large scuared cement container whit elevation.
to help whit the presure for the toilets to work.
no worry about parts o pieces rust.
New PVC pipes
Toiltes at San Juan ?
Wednesday, December 20, 2006
Subscribe to:
Posts (Atom)